Introducing Cost-Time Curves to MS Project The .mpp file available for sale elsewhere on this site allows the project scheduler to optimise the schedule with respect to cost, in turn
Next post
Second Example Figure 1: Setup schedule for cost-time curve Figure 2: Normal schedule Figure 3: At third step, manually enter 2 (for ID 2, cost $100) rather